Photos
Attributes
Steel sheet pile driving and pulling construction: 18m, 15m, 12m, 9m, 6m Larson pile foundation pit, river bridge
$negotiable / ton
Reference Price1ton (Min. Order)
Ship From
Guangdong
Shipping
To be negotiated with the supplier
Customization
For customization requests, please
Ask us in WhatsApp:
Scan the QR code
Product Recommendations
Key Attributes
Details
Price Disclaimer
Brand
Professional Construction
Durability
strong
Weighing method
Calculated by length
construction period
Determine based on the size of the project
Does it support customized processing
Yes
Function
Retaining soil and water
Corrosion resistance
strong
safety
tall
Material
Larson steel plate
Structural form
Sheet pile structure
Length type
Long pile
compressive strength
tall
Specification
18 meters, 15 meters, 12 meters, 9 meters, 6 meters, etc
environmental friendliness
Meets environmental requirements
Product Features
Corrosion-resistant
Service Features
Professional Pulling
Applicable scenarios
Pile driving on water, foundation pit slope protection, river channel, etc
Project Type
Engineering
Steel sheet pile type
Larsen steel sheet pile
Construction method
Artificial pile driving
Maintenance Method
Regular inspection and maintenance
Scope of use
Sewers, park wooden stack roads, bridges, etc
construction difficulty
tall
customization capability
Customize according to customer needs
Details
Price Disclaimer
- Price:The price shown on Aicaigou (foreign currency prices use an estimated exchange rate) is a reference. The final price may change due to promotions, quantity, or specs. For offline transactions, the mutually agreed price prevails; for online orders, the price is as shown at checkout.
- Note:Promotional prices shown on the product page are for specific periods only.The final price is either the checkout total or what you agree with the merchant.If you see an issue with a price or deal, contact the merchant before buying.
Important Notice
- The above product information is provided by BAIDUAICAIGOU, who are responsible for its authenticity, accuracy, and legality.
- Should any issues arise regarding a product, please contact the third-party for its removal. Aicaigou will actively assist and cooperate in this process.
- During trade, please diligently verify all credentials of your business partners to prevent fraud.
