Construction Department of Hongsheng Foundation Earthwork Engineering in Chancheng District, Foshan City (Individual Industrial and Commercial Household)
OS 3

Construction site cement mixing pile service geological exploration pile driver fully hydraulic drilling grouting

$1.14
Reference Price
1rice (Min. Order)
Ship From
Guangzhou, Guangdong
Shipping
To be negotiated with the supplier
Customization
For customization requests, please
Processing & Customization
Yes
Grade quality
Genuine product
Pile driving equipment
Single axis mixing pile
Pile depth
Spray coating ≤ 20M
Form of cooperation
Sign the contract after on-site investigation
Construction advantages
Easy to operate
Application
Highway subgrade
entry time
1-2 days
pile diameter
650mm
construction method
Ash mixing tank
Torque
8000N.m
Details








Price Disclaimer
  • Price:The price shown on Aicaigou (foreign currency prices use an estimated exchange rate) is a reference. The final price may change due to promotions, quantity, or specs. For offline transactions, the mutually agreed price prevails; for online orders, the price is as shown at checkout.
  • Note:Promotional prices shown on the product page are for specific periods only.The final price is either the checkout total or what you agree with the merchant.If you see an issue with a price or deal, contact the merchant before buying.
Important Notice
  • The above product information is provided by BAIDUAICAIGOU, who are responsible for its authenticity, accuracy, and legality.
  • Should any issues arise regarding a product, please contact the third-party for its removal. Aicaigou will actively assist and cooperate in this process.
  • During trade, please diligently verify all credentials of your business partners to prevent fraud.
Inquiry
Chat Now
WhatsApp