Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction
Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction
Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction
Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction
Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction
Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction

Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction

$30,000.00 - 50,000.00/Set
Place of Origin
Shandong, China
Shipping
Air Freight, Ocean Freight, Land Freight

Product Description

Overview

Product Details

Product Description

Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction

Description

The YDLR-5 bag bitumen melting equipment developed by our company takes diesel oil burner as heating sources, thermal oil as heating medium, and the equipment heats the coil to finish the cutting, heating, melting and continuous heating. And the equipment guarantees the heating quality and has the features of high heating efficiency, labor intensity reduction and pollution reduction. Bag bitumen melter components The equipment mainly consists of melting tank, lifting system, diesel burner, exhaust flue heating system, thermal oil heating system, bitumen pump, pipe system and electric control system. Working principle This equipment is specially designed for the melting and heating of 1 ton bag asphalt. The shape is square tank. The top of the equipment is equipped with a electric hoist. The bag asphalt is lifted by the hoist to the feeding port at the top of the equipment. The bottom bag is cut by knives, then the asphalt block in the bag will be taken out and dropped into the equipment through the feeding port to be heated. There are 5 feeding ports, each port will be with one movable lid for insulation and rain proof.

Product Paramenters
Item
Unit
Parameter
Remarks
Product rate
t/h
5
air over 25 degree
Diesel oil consumption
kg per ton
6-8
Asphalt output temperature
over 110 degree
Asphalt storage capacity
≥30
Thermal oil working temperature
200-250
Asphalt pump flow rate
m³/h
16
Total power
kw
15
Outer size
m
11.9×2.2×2.55
shipping size
Detailed Images
Recommend Products
Manufacturing Technique
Company Profile
Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction
Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction
Certifications
Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction
Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction
FAQ
Carbon Steel Fuel Cost Saving Jumbo Bag Bitumen Melting Machine For Road Construction
Q: Are you Factory or trading company ? A: We are Factory with 15 years of production experience. Q: What's your advantages? A: More than 15 years experience, professional design, fast delivery and quick response. Q: How's about the payment terms? A: We usually accept T/T, LC. T/T: 30% in advance as down payment, the balance before delivery. Q: How's about the trade terms? A: EXW, FOB, CFR and CIF are acceptable. Q: How about the delivery time? A: Usually we need about 20 days production time after down pay. Q: How about after-sale service? A: Our products' quality warranty is one year after delivery, we can provide online support, also can send out our engineers to your place if you want. Q: What should I do for the quality problems? A: If you meet quality problems please send to me the products photo first ,our after service department will deal with for you.

Trading Area

Global

Quotation

Name
Company
Phone
Email Address
Requirements
Quotation
Shandong, China
Chat
ManufacturerTraders
Messages